Scroll to top
Gruppo Ingegneria Torino
en it

Hydraulic works in the Valle San Giovanni area

Hydraulic works in the Valle San Giovanni area

Hydraulic works in the Valle San Giovanni area

Design, Works Management and Safety Coordination of the works subject to financing for the...

GIT 7 January 2020
Executive design for new aeronautical fuel depot

Executive design for new aeronautical fuel depot

Multidisciplinary design for the construction of a new fuel depot for refueling of aircraft...

GIT 13 May 2019
Supplementary works for the completion of a Hangar at Ilorin airport in Nigeria

Supplementary works for the completion of a Hangar at Ilorin airport in Nigeria

Following the agreement signed by Alenia Aermacchi with the Nigerian Air Force, GIT was...

GIT 31 December 2018
Hydraulic works on the Bormida di Millesimo River

Hydraulic works on the Bormida di Millesimo River

The hydraulic study, carried out by GIT on behalf of the Unione Montana Langa...

GIT 8 October 2018
Hydraulic verification of IREN dams along the Turin stretch of the Po River

Hydraulic verification of IREN dams along the Turin stretch of the Po River

The outflows of the Po River in the city section between the Carignano bridge...

GIT 8 July 2018
Mini-hydro flowing water design

Mini-hydro flowing water design

Construction of a hydroelectric plant in the Municipality of Tigliole, located along an existing...

GIT 6 March 2015
Protection and drainage system of two landslides in Calabar

Protection and drainage system of two landslides in Calabar

This Executive Project, prepared by Gruppo Ingegneria Torino and GCOS Universal Ltd., concerns the...

GIT 5 March 2012
Doubling of the bridge span over the Dora Riparia river in the municipality of Exilles

Doubling of the bridge span over the Dora Riparia river in the municipality of Exilles

The project of the bridge over the Dora Riparia river in the Municipality of...

GIT 17 June 2011