Scroll to top
Gruppo Ingegneria Torino
en it
Back
Topography

Topographic assistance to installation of prefabricated megacolumns at Iride Energia site

  • Client: GUERRINI PREFABBRICATI S.P.A.

Scroll

The Project

  • Topographical assistance for the laying of precast concrete megacolumns
  • Vertical positioning with topographic methods and control of beam heights

Sectors

Details

  • LOCATION: Turin North Thermoelectric Power Station

  • STATUS: Concluded

Photogallery

Project Sheet

  • CLIENT: GUERRINI PREFABBRICATI S.P.A.

  • SERVICES PERFORMED: Assistance in laying prefabricated elements and survey of the state of the art

  • AMOUNT OF WORK: -

  • SURFACE: -

  • YEAR OF EXECUTION: 2010