New nitrate removal plant for water coming from the M.I.S.E. plant

  • Client: G.E. AVIO

Scroll

The Project

Executive design of the building, structural and civil plant engineering works for the new nitrate removal plant for water coming from the M.I.S.E. plant, as well as the executive design of the total demolition of the buildings, and similar, present in the areas of future construction of the nitrate removal plant, inside the GE AVIO plant in Pomigliano d’Arco (NA).

The complex of structural works connected with the construction of the plant can be divided into the following units:

  • Switchboard building and services
  • Biological tanks
  • Sedimentation tank
  • Thickener
  • Acetic acid and nutrient reservoir

Sectors

Details

  • LOCATION: Pomigliano d’Arco (NA)

  • STATUS: Works completed, works tested

Photogallery

Project Sheet

  • CLIENT: G.E. AVIO

  • SERVICES PERFORMED: Executive Design

  • TENDER AMOUNT FOR STRUCTURAL WORKS ONLY: 757.959,52 €

  • SURFACE: -

  • YEAR OF EXECUTION: 2016-2018