Scroll to top
Gruppo Ingegneria Torino
en it
Back
Civil and Industrial Installations Construction Special plants Structures

Feasibility study for the construction of a new building with waste separation and management system

  • Client: TRM SPA

Scroll

The Project

The heart of the project was the definition of the new layout of the waste treatment plant according to its composition and available space. The analysis of the process was validated by means of numerical simulation (with the aid of specific dynamic modeling software) aimed at verifying the capacity of the system and the autonomy of the storage spaces over a specific time horizon.

The study also provided for the construction of the new building for the plant in question, and all aspects related to it:

  • Structural
  • Construction
  • Electrical installations
  • Mechanical systems for ventilation and dust removal system

Sectors

Details

  • LOCATION: Turin

  • STATUS: Design completed

Photogallery

Project Sheet

  • CLIENT: TRM SPA

  • SERVICES PERFORMED: Feasibility study

  • AMOUNT OF WORK: 5.405.710,00 €

  • SURFACE: -

  • YEAR OF EXECUTION: 2019