Scroll to top
Gruppo Ingegneria Torino
en it
Back
Civil and Industrial Installations Civil and industrial safety Special plants

Adaptation of safety requirements for painting bays

  • Client: Private Client

Scroll

The Project

The project concerns interventions for the adaptation of the painting bay to regulatory requirements.

Following a series of specific surveys, the project included upgrades to the electrical systems and the aerothermal system. In particular, in addition to the installation of a new active carbon filtering system of the extraction air, it was necessary to implement some management systems of the ventilation plant with the painting plant, and in particular:

  • Monitoring system of the operating status of the extraction system and the extraction flow rate with an alarm reminder to alert operators of the dangerous situation;
  • Monitoring system of environmental conditions calibrated to reach the limit concentrations of pollutants.

Sectors

Details

  • LOCATION: Tessera (VE)

  • STATUS: Concluded

Photogallery

Project Sheet

  • CLIENT: Private client

  • SERVICES PERFORMED: Executive design

  • AMOUNT OF WORK: 490.000,00 €

  • SURFACE: -

  • YEAR OF EXECUTION: 2018