Supplementary works for the completion of a Hangar at Ilorin airport in Nigeria

Supplementary works for the completion of a Hangar at Ilorin airport in Nigeria

Supplementary works for the completion of a Hangar at Ilorin airport in Nigeria

Following the agreement signed by Alenia Aermacchi with the Nigerian Air Force, GIT was...

GIT 31 December 2018
Hydraulic works on the Bormida di Millesimo River

Hydraulic works on the Bormida di Millesimo River

The hydraulic study, carried out by GIT on behalf of the Unione Montana Langa...

GIT 8 October 2018
Hydraulic verification of IREN dams along the Turin stretch of the Po River

Hydraulic verification of IREN dams along the Turin stretch of the Po River

The outflows of the Po River in the city section between the Carignano bridge...

GIT 8 July 2018
Protection and drainage system of two landslides in Calabar

Protection and drainage system of two landslides in Calabar

This Executive Project, prepared by Gruppo Ingegneria Torino and GCOS Universal Ltd., concerns the...

GIT 5 March 2012
Topographic assistance to installation of prefabricated megacolumns at Iride Energia site

Topographic assistance to installation of prefabricated megacolumns at Iride Energia site

Topographical assistance for the laying of precast concrete megacolumns Vertical positioning with topographic methods...

GIT 18 June 2010
Topographical assistance to the construction of offshore oil extraction plant

Topographical assistance to the construction of offshore oil extraction plant

Tracking activities of civil works and metal carpentry necessary and in support of the...

GIT 18 June 2009